5th Annual Modular Construction and Prefabrication Asia 2014

Achieving process excellence step-by-step through best practices in designing, fabrication, logistics and on-site installation

14-15 May 2014 at Grand Hyatt Shanghai, Shanghai, CN

Energy and Power, Gas, Oil, & Petroleum

5th Annual Modular Construction and Prefabrication Asia 2014 14-15 May 2014 Grand Hyatt Shanghai, Shanghai, CN
Submit new post
Thank you for posting.
Share it:
More